[C4] Notice of nighttime ramp closure at Ome IC Ken-o Expressway

November 18th (Tue) to 20th (Thu) from 8pm to 6am each day
~ Repair work on damaged pavement ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C4] Notice of nighttime ramp closure at Ome IC Ken-o Expressway

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 496KB]

November 4, 2020
East Nippon Expressway Co., Ltd.
Tokorozawa Management Office

NEXCO EAST Tokorozawa Management Office (Tokorozawa City, Saitama Prefecture) will be closing ramps at night to carry out pavement repair work at the Ome Interchange (hereinafter referred to as the "IC") on the C4 Ken-O Road Ken-o Expressway (hereinafter referred to as the "Ken-O Expressway").
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when going out.

1. Nighttime ramp closure locations and dates

  1. Nighttime closures
    Ken-O Road Expressway Ome IC Exit ramp from the main highway
  2. Image image of night-closed location
    • Attached to each line C4 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    November 18th (Tuesday) to November 20th (Thursday), 2020
    Every day from 20:00 to 6:00 the next morning
    Preparation day:
    November 25th (Tuesday) to November 27th (Thursday), 2020
    Every day from 20:00 to 6:00 the next morning
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Detour

If you are using a local road from Ome IC, please use Iruma IC or Hinode IC, which are one stop before.
If you take the detour shown in the diagram below, it will take approximately 20 minutes (usually about 7 minutes) to travel between Ken-O Road IC and Ome IC on the Ken-O Road Expressway, and approximately 25 minutes (usually about 7 minutes) to travel between Hinode IC and Ome IC on the Ken-O Expressway.
The detour will increase travel time, so please allow yourself plenty of time when traveling.

Image of detour

3. Construction overview

At the Ome Interchange on Ken-O Road, pavement repair work will be carried out due to damage caused by aging. The section where this work will be carried out is a one-lane ramp, and since the work cannot be carried out under normal lane restrictions, the ramp must be closed to carry out the work.
Therefore, in order to minimize inconvenience to our customers, we will close the ramps during the nighttime hours from Tuesday to Thursday when traffic volume is low, and carry out the work intensively and efficiently. This work is necessary to ensure safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

Road surface damage photo Caption image of the road damage situation
Image of pavement repair work work situation Image of caption of work status for pavement repair work

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.
  • On the day of the ramp closing, a detour sign will be installed at the main intersection of the detour.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while driving

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    You can get road traffic information with a VICS-compatible car navigation system.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

関連サイト・コンテンツ

ドライバーズサイト(ドラぷら)

料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。

ドライブトラフィック(ドラとら)

リアルタイムの渋滞・規制情報をお探しの方はこちら。

NEXCO東日本(道路防災情報)公式Xへ

災害時の通行止めなどの道路情報をお探しの方はこちら。