Expressway usage during the year-end and New Year holidays
[Tohoku region version]

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • Expressway usage during the year-end and New Year period [Tohoku region version]

January 6, 2014
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office

NEXCO EAST Tohoku Regional Head Office (Aoba Ward, Sendai City) is our company during the year-end and New Year period [December 26, 2013 (Thurs)-January 5, 2014 (Sun) 11 days] I would like to inform you that we have summarized the usage status of Expressway in the Tohoku region managed by.

Traffic volume and traffic congestion during this period compared to the previous year (*) Both increased.

1 Number of units used

[Average traffic volume on 7 cross sections of main line]

  • All cars: approx. 103% year-on-year (approx. 21,000 units/day)
  • Vehicle type
    : Small vehicles (light vehicles, ordinary vehicles) Approx. 106% of the previous year (approximately 18,000 vehicles/day)
    : Large-sized vehicles (medium-sized vehicles, large-sized vehicles, oversized vehicles) About 92% of the previous year (about 40,000 units/day)
    Attachment-1 [PDF:115KB]
  • Peak: Out-bound is Sunday, December 29th, In-bound is Saturday, January 4th
    Attachment-2 [PDF: 104KB]

[Number of interchanges used (number of vehicles passing through exit toll gates, etc.)]

  • All cars: about 102% of the previous year (about 286,000 units/day)
  • Vehicle type
    : Small vehicles about 103% of the previous year (about 249,000 units/day)
    : Large vehicles about 92% of the previous year (about 37 thousand units/day)
    Attachment-3 [PDF: 104KB]
  • By prefecture [YoY change]
    Aomori: about 105% (about 21,000 units/day), Iwate: about 98% (about 41,000 units/day), Akita: about 104% (about 25,000 units/day), Miyagi: about 103 % (About 94,000 units/day), Yamagata: about 99% (about 31,000 units/day), Fukushima: about 102% (about 74,000 units/day)
    Attachment-4 [PDF:152KB]

2 congestion

Attachment-5 [PDF: 140KB]

  • Congestion of 10 km or more on the main line occurred once in the Out-bound direction (+1 year-on-year) and 0 in the In-bound direction (▲1 year-on-year), a total of 1 time (±0 year-on-year).
  • The maximum length of congestion on the main line is 12.0 km (-0.1 km compared to the previous year), and between Saturday and December 28 (13:11-17:42 peak time 14:23) between the Motomiya interchange and the Koriyama-minami interchange on the Tohoku Expressway It occurred in (Out-bound line). This traffic jam was caused by the confluence and accident near Koriyama JCT.
  • The amount of traffic congestion was 27 km·h (about 113% of the previous year), an increase of about 10%.
  • Congestion extension (km) × congestion time (h) ÷ 2

Comparison period

Image of comparison period

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.