[E46] Kamaishi Expressway Hanamaki JCT - Towa IC
Notice of night traffic closure

September 4th (Monday) to September 11th (Monday) from 20:00 to 6:00 the next morning
~Pavement Repair Work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E46] Kamaishi Expressway Up and Down Line Hanamaki JCT - Towa IC Notice of nighttime traffic closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 914KB]

August 7, 5th year of Reiwa
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Kitakami management office

NEXCO EAST The Kitakami Management Office (Kitakami City, Iwate Prefecture) will close the E46 Kamaishi Expressway (hereinafter referred to as "Kamaishi Road") up and down line between Hanamaki Junction (hereinafter referred to as "JCT") and Towa Interchange (hereinafter referred to as "IC") at night due to pavement repair work.
We apologize for any inconvenience this may cause and ask for your understanding and cooperation in allowing extra time for your trip.

1. Closed section and date and time

  1. Closed section:
    [1] Kamaishi Expressway Up/Down Line Hanamaki JCT - Towa IC
    [2] Kamaishi Expressway Up/Down Hanamaki Airport IC - Towa IC
  2. Image image of closed section
    • The signs such as E46 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    Implementation date:
    [1] September 4, 2020 (Monday)
    From 20:00 to 6:00 the next morning
    [2] September 5 (Tuesday) to September 8 (Friday), September 11 (Monday), 5th year of Reiwa
    From 20:00 to 6:00 the next morning
    Preparation day:
    September 12 (Tue) to September 15 (Fri), 2023
    From 20:00 to 6:00 the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (TOHOKU) twitter (external link)
  • In stormy weather, it will be postponed to the spare day.
  • Construction implementation decisions will be announced on Twitter, etc.

2. Detour

Please refer to [Attachment 1] [PDF: 196KB][Attachment 2] [PDF: 195KB][Attachment 3] [PDF: 190KB] for detours.
The detour will increase the travel time, so please allow yourself plenty of time before heading out.

3. Construction overview

Kamaishi Road Upper and Lower Line Hanamaki JCT ⇔ Towa IC will be damaged on the road surface, so pavement repair work will be carried out. In order to minimize inconvenience to customers, the road will be closed on weekday nights when there is little traffic, and construction will be carried out intensively and efficiently. This construction is necessary for safe and comfortable use of the Expressway, so we ask for your understanding and cooperation.

photo of pavement damage photo
Pavement damage pictures
Pavement repair work Image after completion of work
Image after completion of pavement repair work

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.