[E6] Joban Expressway up and down line Iwaki Nakoso IC / Iwaki Yotsukura IC
Notice of closing the exit ramp at night

October 6th (Friday) to October 31st (Tuesday)
Weekdays from 20:00 to 5:00 the next morning
~Pavement Repair Work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Iwaki Nakoso IC/Iwaki Yotsukura IC exit lamps on Joban Expressway up and down lines will be closed at night

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 3.9MB]

September 8, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Iwaki Management Office

At NEXCO EAST Iwaki Management Office (Iwaki City, Fukushima Prefecture), E6 Joban Expressway (hereinafter "Joban Expressway") In order to carry out pavement repair work at the Iwaki Nakoso Interchange (hereinafter "IC") and Iwaki Yotsukura IC, A nighttime road closure will be implemented.
We apologize for the inconvenience, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. Closed location and date and time

number Road name Closed point period Attachment
【1】 E6 Joban Expressway Iwaki Nakoso IC exit ramp
(Exit from In-bound line Sendai/Koriyama area)
Friday, October 6th
October 10th (Tuesday) - October 12th (Thursday)
8:00 p.m. to 5:00 a.m.
Document 1 [PDF: 2.1MB]
【2】 Iwaki Nakoso IC exit ramp
(Out-bound line, exit from Tokyo direction)
Friday, October 13th
October 16th (Monday) - October 19th (Thursday)
8:00 p.m. to 5:00 a.m.
【3】 Iwaki Yotsukura IC exit ramp
(Exit from Out-bound line Tokyo/Koriyama direction)
Friday, October 20th
October 23 (Monday) - October 26 (Thursday)
8:00 p.m. to 5:00 a.m.
Document 2 [PDF: 1.9MB]
【4】 Iwaki Yotsukura IC exit ramp
(Exit from In-bound line Sendai direction)
Friday, October 27th
October 30th (Mon) - October 31st (Tue)
8:00 p.m. to 5:00 a.m.
Two-dimensional code image link to NEXCO EAST (TOHOKU) twitter (external link)
  • Attached to each line E6 The indications such as indicate the route number (numbering) of Expressway.
  • In case of stormy weather, it will be postponed to a spare day.
    Please refer to the attached document [PDF: 3.7MB] for information on extra days and detours in case of postponement.
  • Construction implementation decisions will be announced on Twitter, etc.

2. Construction overview

Since the road surface is damaged at the exit ramps of Iwaki Nakoso IC and Iwaki Yotsukura IC on Joban Expressway Upper and Lower Lines, we will carry out pavement repair work. In order to minimize inconvenience to customers, we will close the ramps at night when there is little traffic, and carry out construction work intensively and efficiently. We ask for your understanding and cooperation as this work is necessary for safe and comfortable use of Expressway.

photo of pavement damage photo
Pavement damage pictures
Photograph after pavement repair (image)
After pavement repair (image)

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.