[E48] Yamagata Expressway Up/Down Line Murata JCT ~ Miyagi Kawasaki IC
Notice of nighttime road closure

Tuesday, December 5th from 11pm to 6am the next morning
~New gate-shaped signs will be installed~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E48] Yamagata Expressway Up and Down Line Murata JCT - Miyagi Kawasaki IC Night Closure Notice

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 911KB]

November 7, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Sendai Management Office

NEXCO EAST Sendai Management Office (Aoba-ku, Sendai City) is located on the E48 Yamagata Expressway(hereinafter referred to as "Yamagata Expressway") Upper and lower lines From Murata Junction (hereinafter referred to as "JCT") to Miyagi-Kawasaki Interchange (hereinafter referred to as "IC"), we will be closed at night due to the construction of new gate-type signs.
We apologize for any inconvenience this may cause, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. Road closure locations and dates and times

  1. Road closure section:
    Yamagata Expressway Up/Down Line Murata JCT ~ Miyagi Kawasaki IC
  2. Image image of closed section
    • Attached to each line E4 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    Tuesday, December 5, 2020
    11pm to 6am the next morning
    Preparation day:
    Wednesday, December 6th to Thursday, December 7th, 2020
    11pm to 6am the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detour information, please refer to Attachment 1 [PDF: 243KB].
The detour will increase the travel time, so please allow plenty of time for your trip.

3. Regarding transit adjustments due to suspension of traffic

For customers who temporarily leave Expressway due to road closures, bypass the closed section, re-enter and transfer in the forward direction, we will implement "transfer adjustment" in which the toll will be adjusted according to the section used. Masu. (See Attachment 2 [PDF: 393KB])

How to use transit adjustment

ETC customers

  • Customers using ETC are requested to run the outflow designated IC wirelessly and the re-inflow designated IC wirelessly. (No transit certificate will be issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers who pay by cash, etc. should receive the "passage certificate" at the outflow designated IC, and then get the "passport" at the re-inflow designated IC, and then make the "transfer" at the toll booth that pays the fare first. Please give us your "certificate" and "passport".

Common to ETC and cash customers

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.

Four. Construction overview

At Yamagata Expressway Upper and Lower Lines Murata JCT ~ Miyagi Kawasaki IC, we will carry out sign work to install new gate-type sign pillars and sign boards. In this work, it is necessary to carry out the construction with a large crane, and since it is not possible to carry out the construction under normal lane regulations, it is necessary to close the main line to traffic and carry out the work.
Therefore, in order to minimize inconvenience to customers, we will close the road at night on weekdays when traffic is low, and carry out construction intensively and efficiently. This is necessary for the safe and comfortable use of the Expressway, so we ask for your understanding and cooperation.

Photo before installation of gate-shaped signpost
Before installation of gate-shaped signpost
Photo of the gate-shaped signpost after installation (image)
After installing the gate-shaped signpost (image)

Five. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.