[E48] Yamagata Expressway both inbound and outbound, Yudonosan IC to Shonai Asahi IC
Nighttime road closure notice

May 13th (Monday) to May 31st (Friday) 20:00 to 6:00 the next morning
~Tunnel lighting equipment renewal work to be carried out~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E48] Yamagata Expressway Yudonosan IC to Shonai Asahi IC, nighttime road closures

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 460KB]

April 12, 2024
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Tsuruoka Management Office

NEXCO EAST The Tsuruoka Management Office (Tsuruoka City, Yamagata Prefecture) will close the E48 Yamagata Expressway (hereinafter referred to as "Yamagata Road") from the Yudono-san Interchange (hereinafter referred to as "IC") to the Shonai-Asahi Interchange on the up and down lines during the night to allow for tunnel lighting system replacement work, etc.
We apologize for any inconvenience this may cause, and ask for your understanding and cooperation in allowing extra time for your trip.

1. Closed section and date and time

  1. Closed section:
    Yamagata Expressway, inbound and outbound lanes, Yudonosan IC to Shonai Asahi IC
  2. Image image of closed section
    • The signs such as E48 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    Implementation date:
    May 13th (Mon) - May 31st (Fri), 2024
    8:00pm to 6:00am the following morning (excluding weekends and holidays)
    Preparation day:
    Monday, June 3, 2024 - Wednesday, June 5, 2024
    8:00pm to 6:00am the following morning (excluding weekends and holidays)
Image of date and time

Usage Guide

Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detours, please refer to the attached document [PDF: 166KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. Construction overview

On the Yamagata Expressway Upper and Lower Lines, between Yudonosan IC ⇔ Shonai Asahi IC, we will carry out renewal work due to the aging of tunnel lighting equipment.
In order to minimize inconvenience to our customers, we will close the road at night on weekdays when traffic is low, and carry out construction intensively and efficiently. This is necessary for the safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

Photo of photo before lighting update
Photo before lighting update
Photo of the image after the completion of the lighting update work
Image after completion of lighting update work

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.