[E46] Akita Expressway both inbound and outbound, Yuda IC to Yokote IC
[E13] Tohoku-Chuo Expressway Yuzawa IC to Yokote IC
Nighttime road closure notice

August 17th (Mon) - September 10th (Thu), from 8 PM to 6 AM the following morning each day.
We will be carrying out pavement repair work, etc.

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • Notice of nighttime road closures on the following expressways: [E46] Akita Expressway (both directions) Yuda IC to Yokote IC, and [E13] Tohoku-Chuo Expressway (both directions) Yuzawa IC to Yokote IC.

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 1.8MB]

July 17, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita Management Office

NEXCO EAST At the Akita Management Office (Akita City, Akita Prefecture), a nighttime road closure will be implemented on the E46 Akita Expressway (hereafter "Akita-dō") up and down Yuda Interchange (hereafter "IC") to Yokote IC, and on the E13 Tohoku-Chuo Expressway (hereafter "Tohoku Chuo Expressway") between Yuzawa IC and Yokote IC in both directions, to carry out paving repair work and other related work.
We sincerely apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you can allow extra time when you go out.

1. Closed section and date and time

  1. Road closure section:
    [1] Akita Expressway, both directions, Yuda IC to Yokote IC
    [2] Tohoku Chuo Expressway, both directions, Yuzawa IC to Yokote IC
    [3] Tohoku Chuo Expressway, both directions, Jumonji IC to Yokote IC
  2. Image image of closed section
    • The signs such as E46 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    • [1] Akita Expressway, inbound and outbound lanes, Yuda IC to Yokote IC
      Implementation date:
      August 17th (Monday) to August 21st (Friday), 2020
      Every day from 20:00 to 6:00 the next morning
      Preparation day:
      August 24th (Monday) to August 27th (Thursday), 2020
      Every day from 20:00 to 6:00 the next morning
    • [2] Tohoku Chuo Expressway, Yuzawa IC to Yokote IC
      Implementation date:
      August 31st (Monday) to September 1st (Tuesday), 2020
      Every day from 20:00 to 6:00 the next morning
      Preparation day:
      September 11th (Friday) – September 16th (Wednesday), 2020
      Every day from 8:00 PM to 6:00 AM the next morning (excluding Saturdays and Sundays)
    • [3] Tohoku Chuo Expressway, both directions, Jumonji IC to Yokote IC
      Implementation date:
      September 2nd (Wednesday) - September 10th (Thursday), 2020
      Every day from 8:00 PM to 6:00 AM the next morning (excluding Saturdays and Sundays)
      Preparation day:
      September 11th (Friday) – September 16th (Wednesday), 2020
      Every day from 8:00 PM to 6:00 AM the next morning (excluding Saturdays and Sundays)
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • The following parking areas (hereinafter referred to as "PA") located within the road closure section will be closed:
    Akita Expressway, both directions, Yamauchi PA: 8 PM to 6 AM the following morning
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For information on alternative routes, please refer to Attachment 1 [PDF: 710KB].
The detour will increase your travel time, so please allow extra time for your journey.

3. Regarding transit adjustments due to suspension of traffic

Closed Section [1] Akita Expressway (both directions) Yuda IC ~ Yokote IC
Closed Section [3] Tohoku-Chuo Expressway (both directions) Jumonji IC ~ Yokote IC
For passengers who temporarily exit the Expressway due to road closures, bypass the closed section, re-enter the area, and transfer in the direction in the direction of the road, a "transfer adjustment" will be implemented to adjust tolls according to the section used. (See Appendix 2 [PDF: 211KB])

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • Section [1]: If the section between Yuda IC and Yokote IC is closed, customers using the Akita Expressway (toward Omagari and Line Out-bound) from the Tohoku-Chuo Expressway must first exit at Yoko Expressway te IC and then re-enter from Yokote IC. Thank you for your understanding.
  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.
  • Nishisenboku Smart IC can only be used by ETC vehicles, but it is closed from 10pm to 6am the following day.
  • Only vehicles with ETC can use Yokote Kita Smart IC.

Four. Construction overview

Due to road surface damage occurring on the Akita Expressway both directions Yuda IC ~ Yokote IC and the Tohoku Chuo Expressway both directions Yuzawa IC ~ Yokote IC, we will carry out paving repair work. To minimize inconvenience to customers, we close roads on weekday nights when traffic is low, allowing for concentrated and efficient construction. This construction is necessary to ensure safe and comfortable use of the Expressway, so we appreciate your understanding and cooperation.

photo of pavement damage photo
Pavement damage pictures
Image after pavement repair
Image after pavement repair

5. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • The official account of X (formerly Twitter) also provides information about Expressway.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.