[E13] Tohoku-Chuo Expressway both directions, Yamagata Chuo IC to Tendo IC
Nighttime road closure notice

From Monday, September 28th to Friday, October 23rd, from 8 PM to 6 AM the following morning each day.
We will be carrying out pavement repair work, etc.

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E13] Notice of nighttime road closure on both the northbound and southbound lanes Tohoku-Chuo Expressway Yamagata Chuo IC and Tendo IC.

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 1.1MB】

August 28, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Yamagata Management Office

NEXCO EAST At the Yamagata Management Office (Yamagata City, Yamagata Prefecture), a nighttime road closure will be implemented at E13 Tohoku-Chuo Expressway (hereinafter referred to as the "Tohoku Chuo Expressway") from the Yamagata Chuo Interchange (hereinafter "IC") to Tendo IC for paving repair work.
We sincerely apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you can allow extra time when you go out.

1. Closed section and date and time

  1. Road closure section:
    ① Tohoku Chuo Expressway, both directions, Yamagata Chuo IC to Tendo IC
    ② Tohoku Chuo Expressway, both directions, Yamagata JCT to Tendo IC
  2. Image image of closed section
    Geographical Survey Institute (Geographical Survey Institute) Processed by East Japan Expressway Co., Ltd.
    • The signs such as E13 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    • ① Tohoku Chuo Expressway, both directions, Yamagata Chuo IC to Tendo IC
      Implementation date:
      Monday, September 28, 2020 - Wednesday, September 30, 2020
      Every day from 20:00 to 6:00 the next morning
      Preparation day:
      October 26th (Monday) to October 27th (Tuesday), 2020
      Every day from 20:00 to 6:00 the next morning
    • ② Tohoku Chuo Expressway, both directions, Yamagata JCT to Tendo IC
      Implementation date:
      October 1st (Thursday) - October 23rd (Friday), 2020
      Every day from 20:00 to 6:00 the next morning (excluding Saturdays, Sundays, and holidays)
      • Except for Friday, October 9th
      Preparation day:
      October 26th (Monday) to October 30th (Friday), 2020
      Every day from 20:00 to 6:00 the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For information on alternative routes, please refer to Attachment 1 [PDF: 360KB].
The detour will increase your travel time, so please allow extra time for your journey.

3. Regarding transit adjustments due to suspension of traffic

For customers who exit Expressway due to a road closure, detour around the closed section, and then re-enter to continue their journey in the same direction, a "transfer adjustment" will be implemented to adjust the toll based on the sections used. (See Attachment 2 [PDF: 370KB])

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • If the road closure is lifted after exiting at an exit IC, the toll will be adjusted even if you re-enter from an IC in the road closure section in the forward direction or from an exit IC.
  • Sagae Smart Interchange and Yamagata PA Smart Interchange are only accessible to vehicles with ETC (Electronic Toll Collection) systems.

Four. Construction overview

At the Tohoku Chuo Expressway Yamagata Chuo IC ~ Tendo IC, we will carry out pavement repair work to repair road surface damage and signage work related to the construction of the Tendo Minami Smart IC. The section to be carried out is a single lane, and since normal lane restrictions cannot carry out the work, it is necessary to implement road closures during the work. To minimize inconvenience to customers, we will close the road on weekday nights when traffic is low to carry out the work intensively and efficiently. This work is necessary for safe and comfortable use of the Expressway, so we ask for your understanding and cooperation.

Image image of pavement repair work
Pavement repair work
Pavement repair work. Image showing the pavement after repair work (illustration).
Pavement repair work. Image after pavement repair work.
Image showing the completed signage for the Tendo Smart Interchange (image).
Image of the signage at Tendo Smart Interchange after construction.

5. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • Warning signs and digital signage will be posted at nearby toll booths and rest areas.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • The official account of X (formerly Twitter) also provides information about Expressway.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.