[CA] Notice of nighttime closure of Tokyo Wan Aqua-Line Expressway

January 17th (Monday) to 24th (Monday), 4th year of Reiwa From 23:00 to 5:00 the next morning
-Tunnel fall prevention work and inspection of road structures-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [CA] Notice of nighttime closure of Tokyo Wan Aqua-Line Expressway

From 23:00 on January 17th to 5:00 on 18th, CA Tokyo Wan Aqua-Line Expressway (hereinafter referred to as "Aqua Line") up and down line Kawasaki Ukishima JCT to Kisarazu Kaneda ) Interchange (hereinafter referred to as "IC") and CA Tokyo Wan Aqua-Line Expressway connecting road (hereinafter referred to as "Aqua connecting road") In-bound line From Sodegaura IC to Kisarazu Kaneda IC Tunnel fall prevention work and road structures We had to close the road at night for inspection, but there was a delay in the structure removal work at the Aqua Line Out-bound Line Kawasaki Ukishima JCT ⇒ Kisarazu Kaneda IC, and the removal of the road closure was delayed.
We apologize for the inconvenience caused to our customers.

In addition, the night closure will be resumed from January 31st (Monday).
Please check here for details.

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 576KB]

December 16, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Tokyo Wan Aqua-Line Expressway Management Office

At NEXCO EAST Tokyo Wan Aqua-Line Expressway Management Office (Kisarazu City, Chiba Prefecture), CA Tokyo Wan Aqua-Line Expressway (hereinafter "Aqua Line") Up and Down Line Kawasaki Ukishima Junction (hereinafter "JCT") to Kisarazu Kaneda (Kisarazu) Sarazukaneda) Interchange (hereinafter "IC") and CA Tokyo Wan Aqua-Line Expressway access road (hereinafter "Aqua-Line") In-bound line From Sodegaura IC to Kisarazu Kaneda IC We will close the road at night to inspect the road structure.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. Closed section and date and time

  1. Closed section
    Aqua Line Up and Down Line Kawasaki Ukishima JCT-Kisarazu Kaneda IC
    Aqua connecting road In-bound line Sodegaura IC ⇒ Kisarazu Kaneda IC
  2. Image image of closed section
    • The indication of CA etc. attached to each line shows the line number (numbering) of the Expressway
  3. Date and time
    Implementation date:
    January 17th (Monday) to 20th (Thursday) and 24th (Monday), 4th year of Reiwa
    Every day from 23:00 to 5:00 the next morning
    Preparation day:
    January 25th (Tuesday) to 27th (Thursday), 4th year of Reiwa
    Every day from 23:00 to 5:00 the next morning
    January 31st (Monday) -February 3rd (Thursday), 4th year of Reiwa
    Every day from 23:00 to 5:00 the next morning
    February 7th (Monday) to 9th (Wednesday), 4th year of Reiwa
    Every day from 23:00 to 5:00 the next morning
Image of closed days
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • Rest facilities within the closed section will be closed as follows.
    Aqualine Umihotaru Parking Area 21:00 pm to 5:00 the next morning
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Please refer to the attached sheet [PDF: 257KB] for the detour.
The detour will take longer, so please leave plenty of time.

3. Construction overview

In order to keep the road structure in good condition at the Aqua Line, which has been open for 24 years, we will carry out tunnel fall prevention work and inspection of the road structure. Since it is not possible to carry out construction and inspection under normal lane regulations, it is necessary to close the road and carry out the work.
Therefore, in order to avoid inconvenience to customers as much as possible, we will close traffic on weekday nights when traffic is light and carry out construction intensively and efficiently. We ask for your understanding and cooperation as this work is necessary to use the Expressway safely and comfortably.

Image of structure inspection status Image 1
Image of structure inspection status Image 2

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.