-Efforts to ensure long-term safe use of aging Expressway
【E4】東北自動車道 築館IC~一関IC間
リニューアル工事による終日対面通行規制を実施
- Corporate Top
- Press Room
- Press Release Tohoku office
- [E4] Tohoku Expressway Expressway Tsukidate IC to Ichinoseki IC section: All-day road restrictions due to renovation work
平成30年9月11日
東日本高速道路株式会社
東北支社 仙台管理事務所
NEXCO EAST Sendai Management Office (Sendai City, Miyagi Prefecture)E4 Tohoku Expressway Tsukidate IC and Ichinoseki IC, face-to-face traffic control will be enforced from October 10 (Wednesday) due to the floor plate replacement work of the dilapidated Sansakogawabashi . If you use this section, please make further efforts to drive safely and make sure you have enough time to go when you use it.
In addition, we are working to shorten the construction period, such as using precast products produced in the factory in advance, When the construction period is postponed (use a spare day) due to bad weather, etc. Tohoku Expressway Between Ichinoseki IC and Wakayanagi Kinari IC (In-bound), the maximum distance is 1km between 15:00 and 18:00 on November 25 (approx. 5 minutes), and between Tsukidate IC and Wakayanagi Kanari IC (Out-bound), November 23. A maximum of about 2km between 9:00 and 15:00 (passage time +10 minutes) and about 1km at 16:00 on the 25th (passage time +5 minutes) Is predicting congestion. Customers who are planning to use ICs near the regulated section on November 23 and 25, who are predicting the occurrence of traffic congestion, ask for the cooperation of the detour, such as avoiding the traffic congestion prediction section. I will do it. On other days, we do not predict the occurrence of traffic congestion.
During construction Homepage for construction , Or traffic information will be posted on websites such as "DraTra", so please check when using the Expressway.
It is necessary work to keep highway network function sound for a long time. We will do our best to minimize inconveniences to our customers, so please understand and cooperate.
Construction image photograph
- The photo is an example of floor slab replacement work on the Sakogawa Bridge (In-bound line) that was constructed in the spring of 2018.
1. Traffic regulation section
Tohoku Expressway Tsukidate IC-Ichinoseki IC (upper and lower lines)
2. Traffic regulation period and traffic congestion prediction
- 通行規制期間
平成30年10月10日(水)~平成30年12月6日(木)(58日間) - The regulation period may change depending on the weather, so when using Homepage for construction Or check the latest information on websites such as "DraTra".
- 若柳金成IC仙台方面入口(上り線)閉鎖については、同日付リリース「東北自動車道 若柳金成IC仙台方面入口(上り線)でリニューアル工事による夜間閉鎖を実施」をご参照ください。
- 渋滞予測
悪天候等により工事期間を延期(予備日を使用)する場合、下記のとおり休日に渋滞の発生を予測しています。 - 迂回のお願い
渋滞発生を予測している11月23日・25日に規制区間付近のICをご利用予定のお客さまにおかれましては、渋滞予測区間を避けてご利用いただくなど、迂回のご協力をお願いいたします。

- [1] If you are planning to get off at Wakanagi Kinari IC (In-bound line), please consider getting off at Ichinoseki IC, which is one front.
- [2] Customers planning to enter from the Ichinoseki IC (In-bound line), please consider entering from the Wakayanagi Kanari IC one step ahead. [ Route guidance 1 Refer to]
- [3] Customers who plan to get off at Wakanagi Kinari IC (Out-bound line), please consider getting off at the Tsukidate IC, which is one step ahead.
- [4] Customers planning to enter from the Tsukidate IC (Out-bound line), please consider entering from the Wakayanagi Kanari IC, which is one step ahead. [ Route information 2 Refer to]
- During construction Homepage for construction Or, post traffic information on websites such as "DraTra".
Route information 1 (Route from Ichinoseki IC to Wakanagi Kinari IC)
Route Information 2 (Route from the Tsukidate IC to the Wakayanagi Kinari IC)
3. Traffic restrictions
In the floor slab replacement work, we will reduce the section of each two lanes of up and down lines to one lane and consolidate it on one side to enforce face-to-face traffic all day. During the several days at the beginning and end of the construction period, there will be an all-day lane restriction for up and down lanes as a preparatory work to switch lanes.
- 工事規制ステップ図については別添資料-1【PDF:274KB】をご参照ください。
Image of face-to-face traffic regulation
Four. Construction content
東北自動車道 築館IC~若柳金成IC間に位置する三迫川橋は、開通から約40年が経過し、車両の大型化による輪荷重の繰り返しで微細なひび割れ、冬期間の凍結防止剤散布の塩分などが原因となり、コンクリート床版の劣化や鉄筋に錆が生じているため、抜本的な老朽化対策工事を実施する必要があります。
By replacing the deteriorated existing concrete slab with a new slab, it will be reborn as an Expressway that can be used safely and comfortably.
Construction overview
- A floor slab is a structural member that directly supports an automobile or the like passing through a bridge and transmits the load to the girder.
Five. Request when using
- [1] The construction section will be restricted to face-to-face traffic throughout the day for approximately 3.0 km. Since the current number of lanes on each side will be reduced to 2 lanes, please try to drive more safely and make sure you have enough time to travel. Also, Because a spare day may be used due to bad weather etc. , For customers who are planning to use the construction section on November 23 and 25, when traffic congestion is predicted, we would appreciate your cooperation in changing the IC used.
- [2] Since the driving lane and shoulder are narrow in the face-to-face traffic restricted section, observe the regulated speed when traveling, secure the distance between the vehicles, and pay sufficient attention to rear-end collisions. In addition, the lane changes greatly before and after the face-to-face traffic restricted section, so please follow the local information signs and so on.
- [3] There are vehicles coming and going around the construction site, so please be careful and pass ahead.
- [4] During the construction period, we will provide construction regulation information using road information boards and road signs and call for caution to drive safely. Before riding, please check the above information before riding safely.
- [5] Please check the latest traffic restrictions and traffic congestion information on websites such as "DraTra" before going out.
Image of information provision image around the construction site
6. Efforts to minimize inconvenience to customers due to construction work
Use of precast products for shortening the construction period and improving quality
By adopting precast products for floor slabs and wall balustrades, we have shortened the construction period compared to usual and shortened the regulation period to the maximum. * Precast is a product manufactured in advance at a factory.
- Construction flow for precast wall balustrade
Source: DAK precast wall balustrade method study group
Strengthening of information provision
In addition to the information board (electric bulletin board) on the Expressway, the regulation plan will be announced in advance in the Tohoku region through TV commercials, radio commercials, and newspaper advertisements.・ Post a leaflet.
お知らせイメージ ※平成30年の春に実施したリニューアル工事の広報素材です
Expressway information such as traffic congestion
NEXCO EAST Road Traffic Information Site "DraTra" provides real-time traffic information.
[PC]
[Mobile] http://m.drivetraffic.jp/
- Display example of real-time traffic information
7. How to obtain road traffic information
- Road traffic information that can be obtained before going out
- NEXCO EAST Website "Construction regulation information (Provides information on construction regulations in each area)
For Miyagi Prefecture, please see "Minami Tohoku". - NEXCO東日本 道路交通情報サイト「ドラとら」(全国の高速道路交通情報を提供)
【PC】
【携帯】http://m.drivetraffic.jp/ - ハイウェイテレホン5分毎に更新される高速道路の交通最新情報をハイウェイテレホン(自動音声)で24時間提供しています。
仙台局 022-711-1620
(携帯電話・PHS短縮ダイヤル#8162) - NEXCO東日本お客さまセンター(24時間オペレーターが対応します。)
0570-024-024 または 03-5338-7524 - (公財)日本道路交通情報センター(JARTIC)の道路交通情報
050-3369-6761(東北地方・高速情報)
インターネット
- NEXCO EAST Website "Construction regulation information (Provides information on construction regulations in each area)
- Road traffic information available while driving
- Road information board
- Highway radio (AM1620kHz)
Highway radio sections are indicated by signs on the Expressway. - Highway Information Terminal
Wide-area road traffic information is reported on the monitor screens installed at SA and PA.
- Twitterの公式アカウント「NEXCO東日本(東北)」(@e_nexco_tohoku)でも情報を配信しています。

高速道路リニューアルプロジェクト
いま、安全・安心を次の世代へ。
NEXCO東日本は、皆さまに安全・安心を届けるために、高速道路の大規模更新・修繕事業に取り組んでまいります。
URL:https://www.e-nexco.co.jp/renewal/
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.
Related Sites and Content
If you are looking for information on fares, routes, service areas and parking areas, please click here.
If you are looking for real-time traffic congestion and restriction information, click here.
NEXCO EAST (Road Disaster Prevention Information) Official X
Click here if you are looking for road information such as road closures during disasters.